FAQ
FAQ
How do I select the right split case pump?
Share the medium, flow, head, temperature and site conditions; our engineers will recommend the pump, materials and scope.
Can materials and sealing be customised?
Yes. Cast iron, cast steel, stainless steel, duplex stainless steel and different sealing arrangements can be configured for the duty.
What is the typical lead time?
Standard models are usually delivered in 25–45 days; final lead time depends on the selected model, materials and scope.
Do you provide installation and spare parts support?
We provide installation guidance, commissioning and spare-parts support, with site support available when required.
What is included in a smart pump station?
Pump packages, control cabinets, monitoring instruments, remote monitoring and O&M recommendations can be included according to the project scope.