CustomerShougang Group
IndustrySteel
Year2023
Scope3 units / circulating water system
PROJECT BACKGROUND
Project background
The circulating water system operated at high load for long periods, and the upgrade had to respect the existing piping and shutdown window.
OUR SOLUTION
Our solution
TGS high-efficiency split case pumps were selected and matched to the actual operating curve to reduce excess head.
TGS high-efficiency split case pump3 units / circulating water system

Results
Lower energy consumption per tonne of water and improved operating efficiency.